iphonescreen
Reuters reports that Sharp's production of screens for the new iPhone is behind schedule. Sharp Corporation is one of three suppliers of the new displays.

Production of Sharp Corp's screens for Apple Inc's latest iPhone is behind schedule as the Japanese display maker struggles with low production yields, a source close to the matter told Reuters on Friday.

Reuters offers no indication how severe the supply limitations are and if they will have an appreciable effect on the launch. As noted, Apple is also being supplied by Japan Display and LG Display Co for the new iPhone screens.

Apple is expected to announced the new iPhone on September 12th.

Related Forum: iPhone

Top Rated Comments

swb1192 Avatar
162 months ago
The employees were too busy taking pictures for the rumor sites.
Score: 23 Votes (Like | Disagree)
BornAgainApple Avatar
162 months ago
Crack that whip!

Give the past a slip
Score: 11 Votes (Like | Disagree)
BornAgainApple Avatar
162 months ago
When a problem comes along...

You must whip it
Score: 10 Votes (Like | Disagree)
louiek Avatar
162 months ago
Step on a crack

Break your momma's back
Score: 10 Votes (Like | Disagree)
verniesgarden Avatar
162 months ago
Give the past a slip

Step on a crack
Score: 10 Votes (Like | Disagree)
louiek Avatar
162 months ago
It;s just crap to drive up day one demand so they can have another"oh the iPhone sold out! give us press about it!"

When a company wants to drive up demand towards supply what you say makes sense. Apple on the other hand will not be able to supply enough of these to meet demand so what you say is crap.
Score: 8 Votes (Like | Disagree)

Popular Stories

Generic iOS 19 Feature Mock Light

iOS 19 Leak Reveals All-New Design

Friday January 17, 2025 2:42 pm PST by
iOS 19 is still around six months away from being announced, but a new leak has allegedly revealed a completely redesigned Camera app. Based on footage it obtained, YouTube channel Front Page Tech shared a video showing what the new Camera app will apparently look like, with the key change being translucent menus for camera controls. Overall, the design of these menus looks similar to...
2024 App Store Awards

Apple Explains Why It Removed TikTok From the App Store in the U.S.

Sunday January 19, 2025 6:58 am PST by
Apple on late Saturday removed TikTok from the App Store in the U.S., and it has now explained why it was required to take this action. Last year, the U.S. passed a law that required Chinese company ByteDance to divest its ownership of TikTok due to potential national security risks, or else the platform would be banned. That law went into effect today, and companies like Apple and Google...
iPhone 17 Air Size Feature

'iPhone 17 Air' With Rear Camera Bar Allegedly Shown in Leaked Photo

Tuesday January 21, 2025 12:46 pm PST by
A leaker known as "Majin Bu" today shared an alleged image of a component for the rumored, ultra-thin "iPhone 17 Air" model. The blurry, pixelated image shows a pair of rear iPhone shells with a pill-shaped, raised camera bar along the top. On the left side of the bar, there is a circular cutout that appears to be for a single rear camera. On the right side of the bar, there appears to be an ...
iPhone SE Dynamic Island Majin Bu

iPhone SE 4 Leak Shows Dynamic Island, Casts Doubt on Rumored 'iPhone 16E' Name

Monday January 20, 2025 9:01 am PST by
A new iPhone SE is widely rumored to launch this year, and the device has potentially been confirmed today by known leaker Evan Blass. In a private social media post, Blass shared an image of what appears to be source code mentioning an iPhone SE (4th Gen), which casts doubt on the alternative "iPhone 16E" name rumored for the device. However, the name in the source code could be a...
airtag 4 pack blue

AirTag 2 Launching This Year With These 3 New Features

Sunday January 19, 2025 8:11 am PST by
After a four-year wait, a new AirTag is finally expected to launch in 2025. Below, we recap rumored upgrades for the accessory. A few months ago, Bloomberg's Mark Gurman said Apple was aiming to release the AirTag 2 around the middle of 2025. While he did not offer a more specific timeframe, that means the AirTag 2 could be announced by the end of June. The original AirTag was announced...
iOS 19 Roundup Feature

iOS 19 Rumored to Be Compatible With These iPhones

Saturday January 18, 2025 10:28 am PST by
iOS 19 will not drop support for any iPhone models, according to French website iPhoneSoft.fr. The report cited a source who said iOS 19 will be compatible with any iPhone that can run iOS 18, which would mean the following models: iPhone 16 iPhone 16 Plus iPhone 16 Pro iPhone 16 Pro Max iPhone 15 iPhone 15 Plus iPhone 15 Pro iPhone 15 Pro Max iPhone 14 iPhon...
apple power beats pro 2

Powerbeats Pro 2 Coming Soon: Apple to Announce Them 'Imminently'

Sunday January 19, 2025 8:25 am PST by
In September, Apple said that it would be launching Powerbeats Pro 2 in 2025, and it appears the wireless earbuds are coming very soon. Powerbeats Pro 2 images found in iOS 18 code In his Power On newsletter today, Bloomberg's Mark Gurman said the Powerbeats Pro 2 are "due imminently." In addition to Apple filing the Powerbeats Pro 2 in regulatory databases last month, Gurman said Apple is...
Generic iOS 18

Everything New in iOS 18.3 Beta 3

Thursday January 16, 2025 12:39 pm PST by
Apple provided the third beta of iOS 18.3 to developers today, and while the betas have so far been light on new features, the third beta makes some major changes to Notification Summaries and also tweaks a few other features. Notification Summary Changes Apple made multiple changes to Notification Summaries in response to complaints about inaccurate summaries of news headlines. For...